Industrial cooling

Navy Hospital

Under the DoD ESTCP program, a THERMOPHASE-treated 850-ton chiller at a Navy hospital was compared with an untreated chiller.

MORE DEMONSTRATIONS

More industrial cooling demonstrations

Completed field demonstrationIndustrial cooling

District energy plant, New Orleans

Organization
New Orleans, Louisiana
Application
Four ~2,000-ton centrifugal chillers versus four matched untreated controls
Documented outcome
5.6–14.3% lower kW draw by load range; approach temperature maintained at 0.2–1.2 °F
Demonstration details: District energy plant, New Orleans →
Ongoing programIndustrial cooling

Hospital facility

Organization
Pittsburgh, Pennsylvania
Application
Building chillers, treated annually since 2021
Documented outcome
Zero new failed or degraded condenser tubes 2021–2024 by eddy-current testing; annual tube cleaning avoided
Demonstration details: Hospital facility →