Power generation

Longview Power

THERMOPHASE treatment of an operating power-plant condenser at Longview Power, with support from the DOE National Energy Technology Laboratory.

Longview Power plant at sunset

Completed field demonstration

Demonstration summary

Customer
Longview Power, under the DOE Office of Fossil Energy Crosscutting Research Program, managed by the National Energy Technology Laboratory (NETL)
Application
Main condenser of an operating power plant
Dates
Program 2018–2021; final technical report published August 2023
Status
Completed

Result

Plant performance was monitored for two years after application; over that period, condenser back pressure was 0.26 ± 0.13 inHg lower

Economic significance

Over the two years following application: an estimated $3.35M in fuel savings, 136 million lbs less CO₂ emitted and 1.287 billion gallons less water withdrawn, as reported in the DOE final technical report

The problem

Condenser fouling and heat-transfer loss raise condenser back pressure, increasing fuel use, CO₂ emissions and water withdrawal

What was done

THERMOPHASE was evaluated in controlled environments, where improved heat transfer and reduced fouling were observed, then applied to the plant’s main condenser during operation. Plant performance was monitored afterward.

Limitations Results reflect one plant’s operating conditions. The back-pressure reduction carries an uncertainty of ±0.13 inHg, and the fuel, CO₂ and water figures are estimates derived from it.

MORE DEMONSTRATIONS

More power demonstrations

Completed evaluationPower generation

EPRI independent testing

Organization
Electric Power Research Institute
Application
Condenser-tube heat transfer
Documented outcome
Independent evaluation of heat-transfer performance
Demonstration details: EPRI independent testing →